A first high-tech greenhouse is an unusual investment: a building, a factory and a living crop in one. Most projects that disappoint do so for reasons that were visible before the contract was signed. This paper turns those reasons into a checklist. It is written for investors, boards and lenders who are new to protected horticulture and want to ask the right questions of any supplier, including us.

Site and resources

The checklist begins with what cannot be changed later. It explains which climate data to request and why averages are not enough, what a water analysis must show before substrate growing is considered, and how to read the terms of a gas or grid connection. It also covers the points investors tend to leave late: access roads, drainage, labour within commuting distance and distance to market.

Design decisions that fix the cost

Five choices determine most of the capital and operating cost: glass or film, gutter height, the heating and cooling concept, the level of lighting and the degree of water recirculation. For each, the paper sets out the trade-off between investment, running cost and risk, with typical ranges where they are meaningful and without figures where they would mislead.

Numbers a lender will test

We describe what a feasibility study should contain: an energy balance by month, a water balance, a production plan with conservative yield assumptions, a staffing plan and a sensitivity analysis on energy price, sales price and yield. The paper does not give return figures. Those depend on the site and the market, and they belong in a project-specific study.

People and the first crop

The final section deals with the factor most often underestimated. A greenhouse performs as well as the team that runs it. The checklist covers when to hire the head grower, how to plan training before commissioning, what agronomic support to contract for the first crop cycles and how to define handover so that responsibilities are clear.

The full paper includes the ten-question checklist as a printable page and a list of the documents to prepare before requesting a quotation.

Download the whitepaper

  • How to judge a site: climate file, water analysis, soil survey and utility connections
  • Which five design decisions fix most of the investment and the operating cost
  • What a feasibility study must contain before a lender or a board can rely on it
  • Why the growing team and the first crop plan belong in the investment budget